419 results:
Laying of the foundation stone for SC Freiburg stadium

On 29 March 2019, the foundation stone for the new Freiburg football stadium with around 35,000 spectators was ceremoniously laid. KREBS+KIEFER has been in the team of the general contractor…

/en/news/article/laying-of-the-foundation-stone-for-sc-freiburg-stadium
KREBS+KIEFER Karlsruhe 2.0

KREBS+KIEFER has a new home in Karlsruhe. 32 years ago, KREBS+KIEFER had moved into its first branch at the Karlstor. Since the beginning of 2019, the company has now been located in more modern and…

/en/news/article/krebs-kiefer-karlsruhe-20-1
Ground-breaking ceremony for the extension of the pedestrian underpass in Lauda-Königshofen

On 18.03.2019 the ground-breaking ceremony for the extension of the existing pedestrian underpass at Lauda railway station took place. The eastern area of the station is to be redesigned in the…

/en/news/article/ground-breaking-ceremony-for-the-extension-of-the-pedestrian-underpass-in-lauda-koenigshofen
FESTIVE INAUGURATION OF THE TECHNICAL COLLEGE AT THE JAKOB-BRUCKER-GYMNASIUM KAUFBEUREN

On 11 March 2019, the Jakob-Brucker-Gymnasium school family celebrated the solemn opening of the new building for the natural sciences, which was given the name "Technikum", together with…

/en/news/article/festive-inauguration-of-the-technical-college-at-the-jakob-brucker-gymnasium-kaufbeuren
29th Dresden Bridge Construction Symposium

On the 11th and 12th of March 2019 the Dresden Bridge Construction Symposium took place for the 29th time. The Dresden Bridge Construction Symposium has established itself as the most important…

/en/news/article/29th-dresden-bridge-construction-symposium
New high-tech location for ZEISS in Jena

On October 13, 2017, the global technology leader ZEISS announced that more than 300 million euros would be invested in a new location in Jena.

/en/news/article/new-high-tech-location-for-zeiss-in-jena
Topping-out ceremony for "THE CIRCLE" at Zurich Airport

Over 1000 invited guests from among the construction partners, including the team of KREBS+KIEFER Karlsruhe, could take a proud look at the impressive shell of the largest building construction…

/en/news/article/topping-out-ceremony-for-the-circle-at-zurich-airport
Prefabricated part embedded in Neckar according to plan

The Ladenburg flood barrier gate blocks the side canal between Ladenburg and Mannheim-Feudenheim in the event of flooding in order to protect the communities from flooding. An innovative construction…

/en/news/article/prefabricated-part-embedded-in-neckar-according-to-plan
German Construction Technology Day 2019 in Stuttgart

Already for the second time on 7th/8th March 2019 the "Bautechnik-Tag des Deutschen Beton- und Bautechnikvereins e.V. (dbv)" was held at the Stuttgart ICS. And again with manifold and numerous…

/en/news/article/german-construction-technology-day-2019-in-stuttgart
Award at the Ulrich Finsterwalder Civil Engineering Prize 2019

On 12 February 2019, the Kienlesberg Bridge was awarded the prestigious Ulrich Finsterwalder Engineering Prize. KREBS+KIEFER is responsible, in a joint venture with Knight Architects, for the project…

/en/news/article/award-at-the-ulrich-finsterwalder-civil-engineering-prize-2019
Search results 91 until 100 of 419