Branichtunnel Schriesheim
The Branichtunnel, most of which was built by boring, is part of the Schriesheim northern bypass. The structure is 1,796 m long, with approximately 220-metre-long rectangular cross-sections constructed using the cut-and-cover method for the western and eastern entrances.
| Project name | Branichtunnel |
|---|---|
| Location | Schriesheim |
| Planned completion | 2015 |
| Owner | Land Baden-Württemberg, Regierungspräsidium Karlsruhe - Referat Ingenieurbau |
| Services | Independent third party checking |
| Tunnel survey | |
| Design | |
| Structural engineering |


