Industrial canal near the university Freiburg im Breisgau

A sparkling matter

A technical examination of the canal section by KREBS+KIEFER revealed considerable damage. As the industrial canal supplies small hydroelectric plants and industrial plants, there was very little time to rectify the deficiencies.

KREBS+KIEFER planned the work from supporting the trough walls to the renovation of the existing stream walls and the partial renovation of the superstructure with semi-finished parts, with the result that the canal, as planned, was back in operation after just six weeks. During drainage, a barrier of sandbags with pipes integrated into them served to divert the residual water from the road and bank to the construction site. With the re-profiling of the canal wall, a strong rebound of shotcrete was anticipated due to the cramped conditions. The experts selected a special composition for the concrete to make the rebound less severe.

Performances

  • §43 of the HOAI [German Fee Regulations for Architects and Engineers]
  • §51 of the HOAI
  • Building inspection
  • On-site supervision
  • Engineering checks