419 results:
Belfry of Kreuzkirche in Dresden restored

The bells of the Kreuzkirche in Dresden had been silent for more than two years - since 9th March 2009. An expert report assessed damage to the steel belfry structure as so serious that the parish…

/en/news/article/belfry-of-kreuzkirche-in-dresden-restored
Ground-breaking ceremony for Skyline Plaza, Frankurt am Main

The realization of this project - which is directly adjacent to the Frankfurt exhibition grounds and has been planned for more than a decade - started with a ground-breaking ceremony on 1st…

/en/news/article/ground-breaking-ceremony-for-skyline-plaza-frankurt-am-main
Opening of the Hohensaaten road bridge on 27th May 2011

On 27th May 2011, the replacement road bridge at Hohensaaten was officially opened to traffic. A speech on behalf the owner was given by the head of the office for new waterway construction…

/en/news/article/opening-of-the-hohensaaten-road-bridge-on-27th-may-2011
PIANC Annual General Asssembly in Berlin in May 2011:KREBS+KIEFER reports on the new ship lift at Niederfinow

The PIANC Annual General Asssembly took place from 16th to 19th May at the Federal Ministry of Transport, Building and Urban Development (BMVBS) in Berlin. During this event, the…

/en/news/article/pianc-annual-general-asssembly-in-berlin-in-may-2011krebs-kiefer-reports-on-the-new-ship-lift-at-niederfinow
Laying two foundation stones on 23 May 2011 on the former site of the Technical University of Applied Sciences Wildau

On 23 May 2011, Minister of Science Sabine Kunst (2nd from left) and university governor Laszlo Ungvari (4th from left) ceremonially laid the two foundation stones for the Administration Building II…

/en/news/article/laying-two-foundation-stones-on-23-may-2011-on-the-former-site-of-the-technical-university-of-applied-sciences-wildau
Official opening of the Kreuzstraße Tunnel in Tuttlingen

On 17.02.2011, the official opening of the Kreuzstraße urban tunnel took place in Tuttlingen. An introductory address by Mr. Hans-Joachim Bumann, the head of the department for roads and traffic of…

/en/news/article/official-opening-of-the-kreuzstrasse-tunnel-in-tuttlingen
Waldschlösschen bridge over the Elbe in Dresden is in position

On 19th December 2010, the central section of the Waldschlösschen bridge was moved into its final position over the River Elbe. To do this, the 140 meter long bridge section weighing 1800 tons was…

/en/news/article/waldschloesschen-bridge-over-the-elbe-in-dresden-is-in-position
60 years of KREBS+KIEFER: civil engineers design living environments

"Bauingenieure gestalten Lebenswelten" (civil engineers design living environments) was both the motto of the 60-year jubilee celebration and the title of the book that was presented during the…

/en/news/article/622
Topping-out ceremony for the gas turbine plant in Darmstadt

On 2nd December 2010, the topping-out ceremony for the gas turbine plant in Darmstadt took place in the presence of those involved in the planning and construction of the plant. This modern, highly…

/en/news/article/topping-out-ceremony-for-the-gas-turbine-plant-in-darmstadt
New lock in Fürstenberg an der Havel:Opening in time for the 2010 summer season

Fürstenberg lock was officially opened on 6th June 2010, following a 6-month closure of the Oder-Havel waterway. In the presence of Thomas Menzel (President, Waterways and Shipping…

/en/news/article/new-lock-in-fuerstenberg-an-der-havelopening-in-time-for-the-2010-summer-season
Search results 391 until 400 of 419