Felderhalde Tunnel Isny

Completed!

The emergency plan (AGAP) for this 760-metre long road tunnel was prepared in record time: KREBS+KIEFER had just four and a half months to prepare the basic principles, agree the initial version with all those involved, adapt it based on the feedback received from the emergency services and on experiences gained from the safety exercises, and distribute the approved final version in good time prior to commissioning.

The AGAP contains important information regarding construction as well as technical and safety engineering. It governs tunnel monitoring, fault rectification, maintenance and organisation in the event of emergencies and incidents. In this respect, it describes scenarios – disruptions to technical engineering, danger points and malfunctions, accidents and fires – and provides action plans for the tunnel operator and the emergency services involved.

Performances

  • Tunnel safety
  • Emergency plan

 

Schwäbische Zeitung, Ravensburg
Schwäbische Zeitung, Ravensburg
Eugenio Merzagora (www.structurae.de)
Eugenio Merzagora (www.structurae.de)